This week, our factory completed the dispatch of a 500 KWp aluminum roof mounting, vertical ladder, cable tray and FRP walkway in Djibouti.
All structures and HSE accessories for the 500 KWp project finished manufacturing. Our team conducted final quality control inspections on dimensions and anodized coatings.
Components were carefully sorted, bundled, and strapped onto heavy-duty pallets to ensure zero damage during the long ocean transit to East Africa.
One 40ft container was successfully loaded at our factory and dispatched to the port, ready for their journey to Djibouti.


leave a message
Scan to Wechat :
Scan to WhatsApp :